top of page

WASTE TO ENERGY

Waste to energy power plant and Rizzi's part.

WASTE TO ENERGY

Rizzi Engineering announcement for Waste to Energy Process

Waste to Energy Power Plant has basically 7 main components:

  • Bunker

  • Combustion chamber

  • Monofills

  • Boiler (Economizers, Superheater, Air preheating system, Spray Dryer)

  • Air pollution controller chamber

  • Turbines

  • Electricity generating Power house.

The investment in renewable energy technologies, buoyed by EU policies that encourage sustainable development.


It is important to highlight, that during each hour of Waste to energy Power plant operation, the system could prevents also 720 kilograms of CO2 emissions from reaching the atmosphere.

Here comes Rizzi Engineering, that was founded in 1938 and since then is active in heat recovery in oil & gas, steel mills, power industry, chemical and marine industries, biomass, Wte.

We can enter inside the process with design and supply of Air preheater, Economizer, Superheater, Gas Cooler before Bag house, Gas Quench Heat Exchanger.


27 febbraio 2023

Related News:

lorem ipsum, lorem ipsum, lorem ipsum, lorem ipsum, lorem ipsum, lorem ipsum, lorem ipsum, lorem ipsum.

Other News:

lorem ipsum, lorem ipsum, lorem ipsum, lorem ipsum, lorem ipsum, lorem ipsum, lorem ipsum, lorem ipsum.

bottom of page